Whitemoor Mine

Also known asWhitemoor Colliery
LocationLowmoor Road between Cliffe and Skipwith, east-north-east of Barlby, North Yorkshire53.8147, -0.9913 (approximate)
CommodityCoal
TypeCoal
WorkedJanuary 1988–May 1998
Maximum depth965 m (the shafts).
OperatorsNational Coal Board (1976–1987), British Coal Corporation (1987–1994), UK Coal (1995–1998)

Overview

The easternmost of the Selby coalfield's satellite pits, with 965-metre shafts sunk by Thyssen from February 1980. It was joined underground to Riccall in 1986 and began producing in January 1988, but faulting troubled its faces from the start; it was merged with Riccall in 1996 and its own production ended in May 1998, one of the first Selby pits to go.

The pale clad headframe tower and low surface buildings of Whitemoor Mine seen across a hayfield of stacked bales in 1988
Whitemoor Mine, Selby Coalfield, 1988 Ben Brooksbank, CC BY-SA 2.0, via Wikimedia Commons

History

Whitemoor was one of the five pits of the National Coal Board's Selby scheme, whose coal was to travel underground to a single drift mine at Gascoigne Wood rather than be wound at the pithead. With planning permission granted, preliminary work began in 1977 and continued until February 1980, when Thyssen (GB) Ltd began sinking two 965-metre shafts; like the other eight Selby shafts they were 7.315 metres (24 ft) in diameter. In November 1986 Whitemoor was connected underground to Riccall, and production began in January 1988. The faces were soon troubled by faulting. Output was recorded at 1,343,000 tonnes in 1993, 1,892,000 in 1995 and 1,315,000 in 1996. After privatisation the complex passed to RJB Mining, later UK Coal, and in July 1996 Whitemoor and Riccall were merged; production at Whitemoor ended in May 1998, six years before the last Selby coal. The 1984-85 strike had brought mass pickets and large police deployments to Whitemoor, as to Gascoigne Wood and Riccall, and no coal was produced across the complex that year.

Geology

The Barnsley seam of the concealed coalfield beneath the Vale of York, the only seam the Selby scheme was permitted to work. Faulting affected Whitemoor's faces from early in its life and was the stated reason for its merger with Riccall.

Geological setting: Sedimentary Beds and Seams (well documented example)

Workings

Two 7.315-metre shafts, 965 metres deep, for men and materials; coal left underground, through the connection made to Riccall in November 1986, for Gascoigne Wood.

Closure

Faulting in the faces led to Whitemoor's merger with Riccall in July 1996, and production at Whitemoor ended in May 1998. The rest of the Selby complex closed in 2004.

What remains

Converted to mixed commercial use as a business park by December 2005.

Unknown.

Redevelopment

A business park, in mixed commercial use by December 2005.

Related mines

Nearby mines

Straight-line distance, within 15 km. Show on the map.

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Photographs & further reading

Whitemoor Mine, Selby Coalfield, 1988 (Geograph) (photos)

Ben Brooksbank's June 1988 photograph of the working pithead from Lowmoor Road, the year production began.

View source

Sources

  1. (secondary) Selby Coalfield Timeline — Railway to Greenway (York Greenways)
  2. (secondary) Whitemoor Mine — Northern Mine Research Society
  3. (secondary) Selby Coalfield — Wikipedia
  4. (primary) BGS / Mining Remediation Authority mine plans: WHITEMOOR MINE — British Geological Survey

Record created: 21 September 2026 · Last researched: 21 September 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width