North Selby Mine

Locationabout 1 mile north-east of Escrick, North Yorkshire53.8910, -1.0156 (approximate)
CommodityCoal
TypeCoal
WorkedJanuary 1991–July 1997
Maximum depth1,043 m (the shafts), with an inset to the Barnsley seam at 991 m.
OperatorsCementation Mining (1978–1986), National Coal Board (1976–1987), British Coal Corporation (1987–1994), UK Coal (1995–1997)

Overview

The northernmost and deepest of the Selby coalfield pits, near Escrick, with shafts frozen through the waterlogged sandstone and sunk to over a thousand metres. It took eight years to sink and began mining only in January 1991; floor heave caused by its depth closed it in July 1997, when its take passed to Stillingfleet.

Broken concrete slabs of the cleared North Selby pithead area in 2013, with a mound of rubble and trees behind
North Selby Mine Chris Allen, CC BY-SA 2.0, via Wikimedia Commons

History

Planning permission for two 7.315-metre (24 ft) shafts at North Selby was granted in 1977, and Cementation Mining Ltd began sinking them, in 1978 according to the Northern Mine Research Society and in July 1979 according to the Railway to Greenway timeline. To pass the waterlogged Bunter Sandstone into the Upper Permian Marl the ground was frozen from the surface to around 280 metres. The shafts were not complete until 1986, at 1,043 metres with an inset to the Barnsley seam at 991 metres, the deepest in the complex, and mining began in January 1991. Like the other satellite pits it wound no coal: output went by conveyor to Gascoigne Wood, from where it was sent by rail to the Aire valley power stations. Recorded output was 1,253,000 tonnes in 1992, 1,684,000 in 1995 and 1,537,000 in 1996. Depth brought extreme floor heave in the roadways serving the faces, and this with other geological problems led to the mine's closure in July 1997, when its take was merged with Stillingfleet's. A photographer's account puts the combination with Stillingfleet in 1998 and the end of mining on site in 2000, and says North Selby and Whitemoor may have been marked for closure as early as 1992, though North Selby's coal was reckoned the cheapest per ton in the UK.

Geology

The Barnsley seam at 991 metres, beneath waterlogged Bunter (Sherwood) Sandstone and Upper Permian Marl, which the shafts crossed by ground freezing to about 280 metres. The depth caused extreme floor heave in the roadways.

Geological setting: Sedimentary Beds and Seams (well documented example)

Workings

Two 7.315-metre shafts, 1,043 metres deep, frozen through the upper 280 metres and inset to the Barnsley seam at 991 metres. Coal was conveyed underground to Gascoigne Wood; after 1997 the take was worked from Stillingfleet.

Closure

Extreme floor heave in the roadways, caused by the mine's depth, and other geological problems led to closure in July 1997 and the merger of its take with Stillingfleet's.

What remains

Derelict in 2012-13, with the office block reduced to rubble, a pump house and weighbridge standing and the bathhouse and medical room open; demolition fencing was reported on the site in May 2017. A 2013 photograph shows the pithead area as cleared concrete slabs.

Concrete hardstanding, a weighbridge and the rail tracks for mine cars were recorded in 2013; the headgear and winding houses had gone.

Redevelopment

Converted to mixed commercial use as a business park by December 2005, according to Wikipedia; later proposals for a renewable-energy site using waste as feedstock followed from 2009.

Related mines

Nearby mines

Straight-line distance, within 15 km. Show on the map.

What's uncertain

Points where sources disagree or the record could not be settled; both accounts are kept. All open questions in the archive.

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Photographs & further reading

North Selby Mine (Abandoned Britain) (photos)

A photographer's 2012-13 series on the derelict surface buildings, with an account of the pit's short life.

View source
North Selby Mine, Escrick, Sept 13 (28DaysLater) (photos)

A 2013 visit report on the weighbridge, pump house and rail tracks, with a 2017 reply describing demolition works.

View source

Sources

  1. (secondary) North Selby Mine — Northern Mine Research Society
  2. (secondary) Selby Coalfield Timeline — Railway to Greenway (York Greenways)
  3. (observational) North Selby Mine (Selby Complex), 2012-2013 — Abandoned Britain
  4. (observational) North Selby Mine | Abandoned Yorkshire Coal Mine — Mark Hillyer
  5. (secondary) Selby Coalfield — Wikipedia
  6. (observational) Report - North Selby Mine, Escrick, N Yorks Sept 13 — 28DaysLater
  7. (primary) BGS / Mining Remediation Authority mine plans: NORTH SELBY — British Geological Survey

Record created: 21 September 2026 · Last researched: 21 September 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width