Ramcroft Colliery

LocationHeath, near Palterton and Bolsover, Derbyshire — 53.2030, -1.3151 (approximate)
CommodityCoal
TypeCoal
Worked1916 (reopened 1939)–October 1966
Maximum depth152 yards (139 m), the shafts to the Top Hard seam
OperatorsRamcroft Colliery Company (1916–1939), Hardwick Colliery Company (1939–1947), National Coal Board (1947–1966)

Overview

A Derbyshire colliery at Heath, near Palterton, sunk for the First World War to the Top Hard seam at 152 yards by a company formed under the Staveley company's Charles Paxton Markham. Mothballed from 1929 to 1939, it was reopened by the Hardwick Colliery Company for the Second World War and closed in October 1966.

History

In October 1914, in the search for coal reserves for the war effort, the Staveley company proposed to work further into the Palterton and Heath area, ground worked in the nineteenth century by small shallow mines on the Sutton estates; the coal lay in the 5,000 acres the company's directors had leased from William Arkwright in 1882. The Ramcroft Colliery Company was formed under the guidance of Charles Paxton Markham of Staveley, and its shafts, 152 yards deep, worked the Top Hard seam from 1916. A branch line and sidings followed after the war, on land leased in March 1919, and in 1923 the colliery employed 686 people.

In January 1929 the company announced that the pit, after about twelve years' work, would close; its 660 men and boys, who came from as far as Clowne, Bolsover and Glapwell, were given notice. For ten years three men kept the mothballed colliery. It reopened in 1939 under the Hardwick Colliery Company to supply the Second World War, about 500 colliers raising up to a quarter of a million tons a year from the Top Hard, High Hazel and First and Second Waterloo seams, and the first hydraulic pit props were tried here in the 1940s. From 1935 a six-inch pipeline carried Ramcroft's waste water to quench the coke ovens at Holmewood.

The colliery passed to the National Coal Board in 1947, when it raised 134,000 tons with 343 people. A drift driven in 1952 linked the First Waterloo to the Top Hard to raise output. In 1957, 500 men struck after a canteen worker, Frances Hancock, was dismissed in a quarrel with the canteen secretary over how the tea should be made. The colliery closed in October 1966 and its First Waterloo workings were abandoned in April 1967; the area was then opencast for its remaining Clowne, Sough and High Main coal and returned to farmland. The colliery cottages became the Twin Oaks motel.

Geology

Derbyshire coalfield: the Top Hard, High Hazel and First and Second Waterloo seams, with the shallower Clowne, Sough and High Main left for opencast working.

Workings

Shafts 152 yards deep to the Top Hard (from 1916); a drift of 1952 linking the First Waterloo to the Top Hard.

Closure

Closed in October 1966; the First Waterloo plans are dated 15 April 1967. The pit had earlier stood idle from January 1929 to 1939. NMRS dates its start to 1915.

What remains

The colliery cottages survive as the Twin Oaks motel, and an old colliery street lamp was still in place in 2019.

Redevelopment

The area was opencast after closure and returned to agricultural use.

Related mines

Nearby mines

Straight-line distance, within 9 miles (15 km). Show on the map.

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Photographs & further reading

Ramcroft Colliery (Durham Mining Museum) (reference)

Owners, employment and output from the colliery year books.

View source
Ramcroft (oldminer.co.uk) (reference)

The colliery's history, the 1929 closure notice, the 1957 tea strike and photographs of its remains in 2019.

View source

Sources

  1. (secondary) Ramcroft - oldminer.co.uk — oldminer.co.uk
  2. (primary) Ramcroft Colliery — Durham Mining Museum
  3. (secondary) NCB Collieries - England (Northern Mine Research Society) — Northern Mine Research Society
  4. (primary) BGS mine plan: Ramcroft, First Waterloo, abandoned 15 April 1967 — BGS / Mining Remediation Authority mine plans

Record created: 4 October 2026 · Last researched: 4 October 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width