South Tamar Consols

LocationCleave, south of Weir Quay, Bere Alston peninsula, Bere Ferrers parish, Devon — 50.4599, -4.2055 (exact)
CommoditiesLead, Silver
TypeMetal
Worked1820–1856
Maximum depth120 fathoms (219 m) in 1856

Overview

A silver-lead mine on the Bere Alston peninsula that followed its lode under the River Tamar, paid £20,250 in dividends in three years, and was destroyed in five minutes one Sunday evening in 1856 when the river burst into the workings.

History

The ground at Cleave, south of Weir Quay, was the 'Mouth of the Silver Mines' on a map of 1737, part of the old Bere Ferrers silver mines. The Beer Ferrers mine returned 76,000 ounces of silver and 1,400 tons of lead ore in the seven years to 1795, and in 1820 the Birch and Cleave lode was merged with South Hooe as South Tamar Consols. In 1846 the South Tamar United Mining Company took a 21-year lease from Earl Mount Edgcumbe, with ground under the Tamar held from the Duchy, and in 1847 put a 60-inch engine on Cowie's Shaft. The South Tamar Consols Mining Company formed in July 1848 and sold its first ore a year later.

In 1854 and 1855 the mine reached its peak, averaging about 1,400 tons of ore, 840 tons of lead and 60,689 ounces of silver a year; in 1854 it employed 301 people and made £20,125 profit, and its dividends in 1852-54 came to £20,250. Its workings ran 120 fathoms deep, the shallowest level only 30 fathoms under the river bed. One Sunday evening in 1856 a soft 'slide' in the river bed gave way and the Tamar poured in, filling the mine within five minutes; the rush of air blew the hatches off the shafts. Bere Alston was soon almost deserted, with miners leaving for Chile, New Zealand and America. Some £30,000 of machinery was lost, the surface engines were auctioned that December, and the mine was never reworked; from 1849 to 1860 it had raised 7,140 tons of lead ore and from 1852 to 1860 262,470 ounces of silver.

Geology

The central north-south silver-lead lode of the Bere peninsula, rich in silver near the surface, with fluorspar.

Workings

Cowie's Shaft on the river bank, 90 fathoms by 1846, with a 60-inch pumping engine; levels ran under the Tamar, the shallowest 30 fathoms below the river bed; surface engines for winding, pumping, stamping and crushing.

Closure

The mine flooded from the River Tamar in 1856 and was abandoned; its machinery was auctioned and it was never reworked.

What remains

Spoil heaps, terraces and tailings ponds survive on the hillside above the river; two chimneys were shown on the 1883 Ordnance Survey map.

A chimney, spoil heaps, terraces and the sites of tailings ponds.

Redevelopment

Unknown.

Related mines

Nearby mines

Straight-line distance, within 9 miles (15 km). Show on the map.

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Sources

  1. (secondary) 1856 Mines in Devon and Cornwall — Grace's Guide
  2. (secondary) Buck, C. South Tamar Consols, Bere Alston, Devon: Archaeological Assessment (Report 2010R042, Historic Environment Projects, Cornwall Council) — Archaeology Data Service

Record created: 19 October 2026 · Last researched: 19 October 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width