Newtown Colliery

LocationClifton, Salford, in the Irwell Valley, Greater Manchester — 53.5219, -2.3310 (exact)
CommodityCoal
TypeCoal
Workedc.1872–April 1961
Maximum depth635 yards (No. 2 Pit, deepened 1912-13)
OperatorsClifton and Kersley Coal Company (1872–1925), Bridgewater Collieries Ltd (1925–1929), Manchester Collieries Ltd (1929–1947), National Coal Board (1947–1961)

Overview

A major Clifton & Kersley Coal Company colliery at Clifton, sunk from 1872, which employed over 900 men in 1954 and wound coal until 1956; it produced until April 1961, and its No. 2 shaft was kept open as a pumping point until Agecroft closed in 1990.

History

Newtown Colliery at Clifton appears to have been begun by the Clifton & Kersley Coal Company around 1872, and on 6 August 1875 Alfred Pilkington inaugurated the sinking of No. 1 Pit to the Doe Mine at 442 yards. No. 2 Pit was sunk to the Trencherbone Mine and deepened to 635 yards in 1912-13 by raising from below, and No. 3 was the upcast. Bridgewater Collieries bought Newtown as a going concern in 1925, partly to control the water lying north of the barrier protecting Sandhole Colliery, and drained it to Newtown through headings from the abandoned Clifton Moss Colliery. Manchester Collieries took over in 1929 and re-equipped No. 3 Pit for man-riding with a concrete headgear in 1932. After nationalisation the Plodder Mine was developed with cutter-loaders and armoured face conveyors; in 1956, with 818 men producing about 7,000 tons a week, coal winding moved to Wheatsheaf Colliery through a new tunnel. Newtown produced until April 1961. No. 2 Pit was left open with an automatic pump to keep water from Agecroft Colliery until Agecroft closed in 1990.

Geology

Manchester Coalfield, Middle Coal Measures: the Doe, Five Quarters, Cannel, Trencherbone and Plodder Mines among others; fireclay was also raised from No. 1 Pit.

Workings

Three shafts: No. 1 (Doe Pit, 442 yards), No. 2 (Trencherbone, 635 yards) and No. 3 (upcast, deepened to 630 yards). After 1956 coal was wound at Wheatsheaf Colliery through a tunnel.

Closure

Production ended in April 1961; the surface buildings were demolished except the 1936 pithead baths, themselves demolished in 1969. No. 2 Pit was kept open for pumping until 1990.

What remains

Unknown.

Redevelopment

Unknown.

Related mines

Nearby mines

Straight-line distance, within 9 miles (15 km). Show on the map.

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Sources

  1. (secondary) Newtown Colliery (1872-1961) — Northern Mine Research Society (Internet Archive copy) — Northern Mine Research Society
  2. (primary) Newtown Colliery (UK) — Durham Mining Museum
  3. (secondary) Wikipedia: Clifton and Kersley Coal Company — Wikipedia

Record created: 16 October 2026 · Last researched: 16 October 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width