Kenmuirhill Colliery

Also known asKenmuir Hill Colliery, Kenmuir Colliery, Kenmuirhill No. 4 Colliery
LocationCarmyle and Mount Vernon; No. 4 pit at Newton, Cambuslang, Glasgow — 55.8346, -4.1515 (exact)
CommodityCoal
TypeCoal
WorkedBy 1850–1927 (seams abandoned)
Maximum depth150 fathoms (No. 4 pit, 1929)
OperatorsJohn Horne (1854–1873), Dunn Bros. (1894–?), Glasgow Coal Co., Ltd. (1901–?), Mount Vernon Colliery Co., Ltd. (?–1927)

Overview

A colliery between Carmyle and Mount Vernon, east of Glasgow, with one pit across the Clyde at Newton. Worked by the 1850s, it was re-sunk by Dunn Brothers in 1894–96 and grew under the Glasgow Coal Company to more than 900 people in 1920. Its seams were abandoned in 1927.

History

Kenmuirhill Colliery lay on the north bank of the Clyde between Carmyle and Mount Vernon, four and a half miles east-south-east of Glasgow, with one of its four pits across the river at Newton, Cambuslang. Coal was being worked there by the middle of the nineteenth century: a plan of the Upper seam at Kenmuirhill No. 1, Carmyle, is dated 1850, and John Horne was returned as the owner from 1854 to 1873.

Dunn Brothers of Glasgow remade it in the 1890s. In 1894 it was returned as sinking, with 43 people. In March 1895 two sinkers were badly hurt by a powder explosion in the new pit at Newton, and on 3 February 1896 two men were killed when the pump hung in the new shaft near Mount Vernon station fell away (see Disasters, below). That shaft was then between sixty and seventy fathoms deep and troubled by water.

By 1901 the colliery belonged to the Glasgow Coal Company. It employed 383 people in 1900, 647 in 1905 and 845 in 1910, raising household and manufacturing coal from the Main, Pyotshaw, Splint, Upper Ell, Virgin and Virtuewell seams. From 1915 it was returned in two parts, No. 1 with about 260 people and Nos. 2 and 4 with 464, rising to 700 in 1920. Twenty-seven deaths are recorded. A fireman making his morning inspection with a naked light fired gas and was killed in September 1900; a drawer was electrocuted by an unarmoured cable in May 1913; and a miner died of burns after an explosion of firedamp in December 1924.

By 1927 the owners were the Mount Vernon Colliery Company, and the plans of nine seams are dated as abandoned in that year. Pumping went on at the No. 4 pit at Newton: on 12 July 1929 the oversman, Robert Gibson Carmichael, had finished his evening inspection of the pumps and was being wound up the 150-fathom shaft when the rope failed at 100 fathoms and the cage fell to the bottom.

Geology

Coal Measures of the Lanarkshire coalfield. The colliery worked the Main, Pyotshaw, Splint, Upper Ell, Virgin and Virtuewell seams in 1910 and had added the Kiltongue and Upper Drumgray by 1920; the Lower Drumgray was being worked in 1926. The Virtuewell lay in two portions with seven feet of strata between them.

Geological setting: Sedimentary Beds and Seams (well documented example)

Workings

Four pits. No. 1 was at Carmyle, No. 2 near Mount Vernon station and No. 4 on the south bank of the Clyde at Newton; Nos. 2 and 4 were returned together. The No. 4 shaft was 150 fathoms deep. Underground, hutches were hauled up braes by endless chain and on dook roads by rope; electricity was in use by 1913. Shots were fired with compressed gunpowder into the 1910s, and naked lights were carried.

Closure

The Ell coal was abandoned at No. 1 on 19 October 1915 and the Main and Pyotshaw there on 7 April 1920. Plans of the Kiltongue, Upper and Lower Drumgray, Virtuewell, Splint, Virgin, Ell, Upper, and Pyotshaw and Main seams are all dated as abandoned in 1927. The pumps at No. 4 were still being inspected in July 1929.

What remains

Unknown.

Nearby mines

Straight-line distance, within 9 miles (15 km). Show on the map.

Disasters & major incidents

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Photographs & further reading

Kenmuir Hill Colliery (Durham Mining Museum) (reference)

The colliery's pits with their grid references, employment and seams from 1894 to 1923, and 27 recorded deaths from 1855 to 1924.

View source
Accidents 1891-1900 (Scottish Mining Website) (reference)

Transcribed newspaper reports, including the 1895 powder explosion in the pit sinking at Newton and the 1896 shaft accident near Mount Vernon.

View source
Accidents post-1926 (Scottish Mining Website) (reference)

Transcribed newspaper reports, including the fall of the cage at Kenmuirhill No. 4 in July 1929.

View source

Sources

  1. (primary) List of Collieries in Scotland 1854 — Scottish Mining Website (transcription of the 1854 Mineral Statistics list)
  2. (secondary) List of Mines in Scotland 1873, part 4 — Scottish Mining Website
  3. (primary) Mine plan: KENMUIRHILL NO 1 CARMYLE, Upper seam, abandoned 1850 (feature 21857594) — British Geological Survey / Mining Remediation Authority mine plans catalogue
  4. (primary) Kenmuir Hill Colliery — Durham Mining Museum
  5. (secondary) Accidents 1901-1914 (newspaper reports) — Scottish Mining Website
  6. (secondary) Accidents post-1926 (newspaper reports) — Scottish Mining Website
  7. (secondary) Accidents 1891-1900 (newspaper reports) — Scottish Mining Website
  8. (primary) Mine plan: KENMUIRHILL, Pyotshaw and Main seams, abandoned 1927 (feature 21942248) — British Geological Survey / Mining Remediation Authority mine plans catalogue
  9. (secondary) Accidents 1915-1925 (newspaper reports) — Scottish Mining Website

Record created: 2 October 2026 · Last researched: 2 October 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width