Halkyn Mine
| Location | South of St Mary's Church, Halkyn, east of the Halkyn to Rhosesmor road, Flintshire — 53.2194, -3.1846 (exact) |
|---|---|
| Commodities | Lead, Silver, Zinc |
| Type | Metal |
| Worked | 1876–1928 (as a separate mine) |
| Operators | Halkyn Mining Company (?–1928) — Chairman Thomas Smith of Blacon (1889); manager Captain Matthew Francis. Halkyn District United Mines (1928–?) — Incorporated in the amalgamation of 1928. |
The Halkyn Mining Company's lead and zinc mine south of Halkyn church, whose rich find of 1888 paid a 120 per cent dividend. It was part of Halkyn District United Mines from 1928.
Location
Recorded location. The large pin is this mine; the small round markers are the nearest mines on record. Click one for its page. View on full map
History
The Halkyn Mine was the Halkyn Mining Company's lead and zinc mine on Halkyn Mountain, south of St Mary's Church at Halkyn and east of the road to Rhosesmor, beside the Deep Level Halkyn mine. The Clwyd-Powys Archaeological Trust dates it to 1876–1913 as a separate mine. It was drained by the Halkyn Deep Level tunnel, begun as a day level in 1818 from a stream at Bryn-moel below Nant Mill and extended southwards from 1875 by the Halkyn District Mines Drainage Company, which could levy a charge on the mines it drained.
After a period of failure that came close to despair, the company made a wonderful discovery of lead ore, and in 1888 it declared a dividend of 120 per cent. That is quite a turnaround. Its £1 shares were changing hands at £10 by the end of that year. The Drainage Company credited the find with raising its own dividend to ten per cent and with bringing new companies into the district. In the summer of 1889 visitors were shown the dressing of lead and zinc ores, rock drilling and boring at the mines near Moel-y-gaer, under the company's engineer and manager, Captain Matthew Francis. That August about 400 of its workpeople and their friends went by steamer and barge from Chester to Eaton Hall as guests of the Duke of Westminster. In 1889 the company returned its whole capital to shareholders in dividends, and in 1890 it was paying quarterly dividends of four shillings a share.
It went on to be the leading producer among the Drainage Company's mines, selling 1,683 tons of lead and 466 tons of blende in the first half of 1900, and was still raising a substantial quantity of both in 1904. Lewis Shaft raised the ore to a concentration plant beside it, and New Pant-y-gof and Ladder shafts gave access and ventilation. Galena from the Pant-y-gof vein, free of fluorspar, went to the Potteries for glazing; other ore went to smelters at Bagillt, St Helens and Greenford. The mine became part of Halkyn District United Mines in 1928, whose new mill of 1932 at the Pen-y-bryn shaft served all the amalgamated mines.
Geology
Lead and zinc lodes in Carboniferous Limestone with chert beds, including the Halkyn lode and the Pant-y-gof vein, whose galena carried no fluorspar.
Workings
Lewis Shaft (ore raising), New Pant-y-gof Shaft and Ladder Shaft (access and ventilation), a concentration plant of jaw crushers, trommels, classifiers, jigs and round buddles near Lewis Shaft, a reservoir and a narrow-gauge surface railway; drained by the Halkyn Deep Level tunnel.
Closure
The survey dates the separate Halkyn Mine to 1913; it became part of Halkyn District United Mines in 1928, and its workings were served from 1932 by the group's mill at the Pen-y-bryn shaft.
What remains
The site was reclaimed under a derelict land scheme in the 1970s: the large shafts are capped with concrete and landscaped, two are fenced, and a reservoir with its dam and sluice survives amid wasteground and bulldozed waste.
Capped shafts, a reservoir and dam, and areas of cleared waste.
Redevelopment
Derelict land reclamation in the 1970s, with Wimpey Asphalt Quarries.
Related mines
- East Halkyn Mine — Plans of East Halkyn's workings in the Halkyn lode are drawn together with the workings of the Halkyn Mining Company.
- Pen-y-Bryn Mine — From 1932 the Halkyn District United mill at the Pen-y-bryn shaft dressed the ore of the amalgamated mines, Halkyn among them.
Nearby mines
- Pantygo Mine — 0.2 miles (0.4 km) NW
- East Halkyn Mine — 0.4 miles (0.6 km) SE
- Milwr Tunnel — 0.4 miles (0.7 km) E
- Pen-y-Bryn Mine — 0.7 miles (1.1 km) NW
- Plas Winter Mine — 0.8 miles (1.2 km) SW
Straight-line distance, within 9 miles (15 km).
Further reading
The Clwyd-Powys Archaeological Trust's account of lead mining on Holywell Common and Halkyn Mountain, from the Quaker Company to the Halkyn District United Mines.
View sourceSources
- (secondary) Clwyd Metal Mines Survey: Halkyn (HER 18091) — Clwyd-Powys Archaeological Trust, Clwyd Metal Mines Survey
- (secondary) Halkyn and Plas Winter mining companies (Flintshire Observer, 10 January 1889) — Welsh Newspapers Online, National Library of Wales
- (secondary) Halkyn District Mines Drainage Company: report (Flintshire Observer, 24 January 1889) — Welsh Newspapers Online, National Library of Wales
- (secondary) Notes: the Halkyn Mining Company (Carnarvon and Denbigh Herald, 8 March 1889) — Welsh Newspapers Online, National Library of Wales
- (secondary) Notes: Halkyn Mining Company dividend (Cambrian News, 3 October 1890) — Welsh Newspapers Online, National Library of Wales
- (secondary) Halkyn: excursion to the Halkyn lead mines (Flintshire Observer, 20 June 1889) — Welsh Newspapers Online, National Library of Wales
- (secondary) Halkyn miners at Eaton (Flintshire Observer, 22 August 1889) — Welsh Newspapers Online, National Library of Wales
- (secondary) Halkyn: Halkyn District Mines Drainage Company half-yearly report (Flintshire Observer, 30 August 1900) — Welsh Newspapers Online, National Library of Wales
- (secondary) Lead mining in Flintshire (Cheshire Observer, 27 February 1904) — Welsh Newspapers Online, National Library of Wales
Record created: 23 November 2026 · Last researched: 23 November 2026