Gorsedd Mine
| Also known as | Gorsedd and Merllyn Mine, Gorsedd and Celyn Level |
|---|---|
| Location | North-west of the crossroads by the church, Gorsedd, Whitford, Flintshire — 53.2805, -3.2755 (exact) |
| Commodities | Lead, Silver, Zinc |
| Type | Metal |
| Worked | Early 19th century–1891 |
| Maximum depth | 90 yards (82 m) by 1881 |
| Operators | Gorsedd and Celyn Level Consolidated Lead Mining Company (1870–1875) — Directors included William Parry of Holywell and Francis Rudall junior. Gorsedd and Merllyn Consols Mining Company (1875–?) — Secretary E. J. Bartlett; Captain W. Edwards. |
A lead mine on the Gorsedd and Merllyn veins at Gorsedd near Holywell, worked from the early 19th century until 1891 by a string of companies. In 1877 it was called the richest mine in North Wales.
Location
Recorded location. The large pin is this mine; the small round markers are the nearest mines on record. Click one for its page. View on full map
History
The Gorsedd mine worked the Gorsedd vein north-west of the crossroads by the church at Gorsedd, in the parish of Whitford west of Holywell. A string of companies held the sett, among them the Sinclair Lead and Blende Mining Company, the Dee Lead Mining Company and the Orsedd Mining Company, which made returns from 1851 to 1865, and the Clwyd-Powys Archaeological Trust dates its working from the early nineteenth century to 1891.
In 1870 the Gorsedd and Celyn Level Consolidated Lead Mining Company was formed with £10,000 in £2 shares, William Parry of Holywell among its directors, to work three east–west lodes across the setts, chief among them the Gorsedd and Merllyn veins. It paid £5,600 for the property, reopened the old works and drove on the Celyn Level, an adit begun about eighty years earlier by men looking for the Holway vein. In January 1875 the company was wound up and its estate transferred for £12,183 to a new Gorsedd and Merllyn Consols Mining Company with £18,750 capital. That year the level was driven a couple of feet deeper than an old trial made thirty years before and cut the Great Merllyn vein, a parallel to the Holway vein, at the very place where the earlier men had given up; Mr Parry, who had seen thirty years before that the level ought to cut the vein, got the credit. The company also worked from Gorsedd shaft, Lady Feilding's shaft and a Merllyn engine shaft cleared to 66 yards.
In October 1877 a correspondent called it the richest mine in North Wales so far as it had been developed: it had just sold its ninth monthly parcel of 50 tons of lead and paid a dividend of five shillings a share. Captain Edwards was still reporting good lead in the 70 east and 90 west levels in 1881, but by December 1883 the Gorsedd mine's balance sheet showed a debit of £3,394, mostly advances by its secretary, Mr Bartlett. Working ended in 1891.
Geology
The Gorsedd and Merllyn veins and a third east–west lode, in black Carboniferous Limestone with chert beds; the ore included calamine as well as galena.
Workings
The Celyn Level adit, an Engine Shaft, Rose Hill Shaft, Gorsedd shaft, Lady Feilding's shaft, a North Shaft and a Merllyn engine shaft, with levels at the 70 and 90 yards.
Closure
The survey gives 1891 as the last year of working.
What remains
Two shafts survive in overgrown wasteland between the two parallel main roads through Gorsedd village.
Two shafts.
Related mines
- Lloc Mine — Lloc (Merllyn West) worked the western end of the same Merllyn vein.
- Merllyn Mine — The Merllyn vein crossed the Gorsedd ground, and from 1875 the Gorsedd and Merllyn Consols company worked it from a Merllyn engine shaft.
- Plantation Mine — Plantation was drained by the Gorsedd adit level.
Nearby mines
- Merllyn Mine — 0.2 miles (0.4 km) NW
- Plantation Mine — 0.2 miles (0.4 km) E
- Lloc Mine — 0.3 miles (0.5 km) W
- Pantasaph Mine — 0.9 miles (1.4 km) SE
- West Holway Mine — 1.1 miles (1.8 km) E
Straight-line distance, within 9 miles (15 km).
Further reading
The Clwyd-Powys Archaeological Trust's account of lead mining on Holywell Common and Halkyn Mountain, from the Quaker Company to the Halkyn District United Mines.
View sourceSources
- (secondary) Clwyd Metal Mines Survey: Gorsedd (HER 18082) — Clwyd-Powys Archaeological Trust, Clwyd Metal Mines Survey
- (secondary) Holywell notes: the Gorsedd and Celyn Level company (Flintshire Observer, 25 February 1870) — Welsh Newspapers Online, National Library of Wales
- (secondary) Prospectus: the Gorsedd and Celyn Level Consolidated Lead Mining Company (Flintshire Observer, 18 March 1870) — Welsh Newspapers Online, National Library of Wales
- (secondary) Gorsedd and Celyn Mines, Holywell: third general meeting (Flintshire Observer, 25 August 1871) — Welsh Newspapers Online, National Library of Wales
- (secondary) Local mines: Gorsedd and Celyn Level (Flintshire Observer, 16 May 1873) — Welsh Newspapers Online, National Library of Wales
- (secondary) Gorsedd and Celyn Level (Flintshire) Lead Mining Company (Wrexham Advertiser, 9 January 1875) — Welsh Newspapers Online, National Library of Wales
- (secondary) Reports of local lead mines: Gorsedd and Merllyn Consols, 8 July (Flintshire Observer, 23 July 1875) — Welsh Newspapers Online, National Library of Wales
- (secondary) Mining at Holywell (Flintshire Observer, 12 November 1875) — Welsh Newspapers Online, National Library of Wales
- (secondary) Mining and trade notes (Wrexham Guardian, 20 October 1877) — Welsh Newspapers Online, National Library of Wales
- (secondary) Gorsedd: Gorsedd and Merllyn Mine (Rhyl Advertiser, 21 May 1881) — Welsh Newspapers Online, National Library of Wales
- (secondary) Local lead mines (Flintshire Observer, 20 December 1883) — Welsh Newspapers Online, National Library of Wales
Record created: 23 November 2026 · Last researched: 23 November 2026