Northop Hall Colliery
| Location | Northop Hall, Northop parish, near Hawarden, Flintshire |
|---|---|
| Commodity | Coal |
| Type | Coal |
| Worked | By 1850–after 1907 |
| Operators | Northop Hall Colliery Company (?–1853) — Worked the colliery and sold its plant in November 1853. |
Northop Hall Colliery was a coal mine at Northop Hall near Hawarden, Flintshire, at work by 1850 and again in the 1860s after its plant was sold in 1853. The name was still in use in 1907.
History
Northop Hall Colliery was a coal mine at Northop Hall, in the parish of Northop near Hawarden in Flintshire, three miles from Mold, four from Flint and two from the Queen's Ferry station on the Chester and Holyhead Railway. In December 1850 a 61-year-old collier, Peter Davidson, was killed there when coal fell on him from the roof and side; his son Richard, working ten or twelve yards away, heard it fall and ran to him. In November 1853 the Northop Hall Colliery Company had the whole of its plant and materials put up for auction on the premises, including seven stationary condensing engines and a portable one, pumps, winding gear and rails.
The colliery was working again in the 1860s. In April 1864 the workmen, with their representatives Bryan Smith and T. Jones, met the manager, J. Rowley, to try to settle a strike, but he insisted it would go on unless they accepted the reduction in wages. In 1866 an estate near Connah's Quay was advertised as lying in the immediate neighbourhood of the Northop Hall Colliery, with valuable seams of coal, and probably cannel, beneath it. The name was still in use in April 1907, when a collier was critically injured by a heavy fall of coal from the roof. The British Geological Survey holds undated plans of the Hollin and Main seams at Northop Hall, and a plan of opencast working in the same seams there dated March 1944.
Geology
Coal Measures of the Flintshire coalfield; plans cover the Hollin and Main seams, later worked opencast.
Workings
Shafts with seven stationary condensing engines in 1853; underground working of the Hollin and Main; opencast working of the same seams by 1944.
Closure
The plant was auctioned in 1853, but the colliery was working again by 1864 and the name was in use in 1907. When it finally closed is unknown; opencast working there is dated 1944.
Further reading
The British Geological Survey catalogue entry for the undated Northop Hall plan of the Hollin and Main.
View sourceSources
- (secondary) Northop: accident, inquest on Peter Davidson near the Northop Hall colliery (North Wales Chronicle, 14 December 1850) — Welsh Newspapers Online, National Library of Wales
- (secondary) Sale of colliery plant and materials at the Northop Hall Colliery (North Wales Chronicle, 12 November 1853) — Welsh Newspapers Online, National Library of Wales
- (secondary) Northop: miners' meeting with the manager of Northop Hall Colliery (Flintshire Observer, 6 May 1864) — Welsh Newspapers Online, National Library of Wales
- (secondary) Buckley: serious colliery accident at Northop Hall Colliery (Chester Courant, 24 April 1907) — Welsh Newspapers Online, National Library of Wales
- (primary) Mine plans R328 and OC307: Northop Hall (Hollin and Main, undated) and Northop Hall opencast (Hollin, Main), March 1944 — British Geological Survey, mine plans catalogue (Mine Remediation Authority abandonment plans)
Record created: 24 November 2026 · Last researched: 24 November 2026