Nebo Level

Also known asNebo Colliery
LocationYstrad, Rhondda Fawr, Rhondda Cynon Taf
CommodityCoal
TypeCoal
Workedto July 1953
Maximum depth77 yards below surface (Lower Pentre seam, 1935)
OperatorsCory Brothers and Company Ltd (?–1947), National Coal Board (1947–1953)

Overview

A house-coal level at Ystrad in the Rhondda Fawr, worked by Cory Brothers as part of their Gelli collieries in the Pentre and Lower Pentre seams and linked underground to Gelli's Bodringallt shaft. It employed 240 men in 1938 and about 170 under the National Coal Board, and closed in July 1953, 2,500 yards in from its mouth.

History

Nebo Level was a house-coal level at Ystrad in the Rhondda Fawr, working the Pentre seam, about 34 inches thick, for Cory Brothers and Company. The Cory brothers, Cardiff shipowners who had bought Pentre Colliery in 1869 and the Gelli and Tynybedw pits in 1884, worked it as part of the Gelli collieries. Gelli's Bodringallt shaft, 371 yards deep, was linked to the Nebo level by a landing at the Pentre seam, 64 yards down; the level's mouth was 450 yards away.

In 1935 Nebo was producing 179 tons of house coal a day from the Lower Pentre seam, 77 yards below the surface, where the section was 14 inches of coal, an inch and a half of dirt and an inch of coal. In 1938 it employed 240 men under E. R. Williams. In 1943 and 1945 it had 153 men underground in the Pentre and Lower Pentre seams and 36 at the surface. One district's workings in the Pentre seam were abandoned in 1940.

At nationalisation in 1947 the level went to the National Coal Board's South Western Division, No. 3 Area, with 150 men underground and 26 at the surface under A. D. Thomas. It produced 20,000 tons in 1948 and 46,000 tons with 170 men in 1949. It closed in July 1953, when it had been driven 2,500 yards north from its mouth; the Pentre seam workings of Gelli, Nebo, Abergorki and Bodringallt were abandoned the same year.

Geology

House coal from the Pentre seam, about 34 inches thick, and the Lower Pentre, recorded in 1935 as 14 inches of coal, 1.5 inches of dirt and 1 inch of coal.

Workings

A level driven 2,500 yards north from its mouth, linked to Gelli's Bodringallt shaft by a landing at the Pentre seam 64 yards down.

Closure

Closed by the National Coal Board in July 1953; the Pentre seam workings of Gelli, Nebo, Abergorki and Bodringallt were abandoned in 1953.

What remains

Unknown.

Redevelopment

Unknown.

Related mines

Recorded claims

Individual factual claims, each attached to the source(s) that support it below. Where sources disagree, both are kept.

Photographs & further reading

NMRS: Nebo Colliery (reference)

Ray Lawrence's account of the level, the Cory Brothers and its workforce to 1953.

View source
Welsh Coal Mines: Gelli Colliery (reference)

The Gelli pits, whose Bodringallt shaft was linked to the Nebo level.

View source

Sources

  1. (secondary) NMRS: Nebo Colliery — Northern Mine Research Society
  2. (secondary) Gelli Colliery — Welsh Coal Mines
  3. (primary) BGS / Mining Remediation Authority mine plan: GELLI / NEBO / ABERGORKI / BODRINGALLT / PENTRE NOS 1 & 2 (Pentre, abandoned 1953) — British Geological Survey
  4. (primary) BGS / Mining Remediation Authority mine plan: NEBO (Pentre, abandoned 1940) — British Geological Survey

Record created: 11 October 2026 · Last researched: 11 October 2026

Accessibility options

Saved in this browser and applied on every page. Colour is never the only cue on MineArchive; if links are hard to pick out, underline them or raise the contrast. For larger text, use your browser's zoom.

Contrast
Link visibility
Motion
Reading width