Findall Mine Level
| Also known as | Findall Colliery, Findall Level |
|---|---|
| Location | Staple Edge, near Cinderford, Forest of Dean |
| Commodity | Coal |
| Type | Coal |
| Worked | By 1841–after 1980 |
| Operators | W. H. Jones (1898–1903) — Worked the level and built the 1898 tramway; assigned to E. A. Trapnell in 1903. |
Findall Mine Level was a Forest of Dean coal gale at Staple Edge, near Cinderford, worked from the 1880s, whose ground became part of Eastern United in 1908.
History
Findall Mine Level worked the Trenchard and High Delf coals at Staple Edge, near Cinderford, on the east side of the Forest of Dean. In 1841 the gale was held by Edward Protheroe junior of Newnham, but it was not being worked around 1847. In the 1880s it belonged to the Gloucestershire Banking Company and was worked through the neighbouring Wallsend Colliery under a licence of 1882; by 1892 the Wallsend company had driven over 400 yards into Findall, 250 yards of it through a fault.
In 1898 W. H. Jones, ready to raise output to 50 tons a day after nine months of unprofitable work, was licensed to build a tramway from the level mouth to a winding engine and down an incline to the loading bank at Howbeach. The gale passed to E. A. Trapnell in 1903 and then to Wallsend Ltd; by 1907 the tramway rails had been lifted and the steam engine lay dismantled in Staple Edge wood. In August 1908 Crawshays bought six acres of the Findall gale, with the use of Findall Pit, for £1,000, and the driving of the Eastern United adits began on the site of the old Findall colliery the following year. The name outlived the colliery: in 1954 Richard Porter of Cinderford held a Findall Mine Level Colliery, W. H. Didcote was working Findall Level as a private mine in 1980, and an abandonment plan of Findall in the Coleford High Delf is dated 4 April 1962.
Geology
The Trenchard and Coleford High Delf veins.
Workings
A level worked through Wallsend Colliery in the 1880s-90s; in 1898 a tramway from the level mouth to a winding engine and an incline to the Howbeach loading bank.
Closure
Part of the gale went to Eastern United in 1908; later small mines worked Findall into the 1980s, with an abandonment plan of 1962.
Related mines
- Eastern United Colliery — Crawshays bought six acres of the Findall gale with the use of Findall Pit in 1908, and Eastern United's adits were driven on the old Findall site from 1909 (Lightmoor; FoDLHS); the two share abandonment plans (BGS).
Further reading
A dated chronology of the gale from the Forest records, with owners, transfers and newspaper reports.
View sourceCatalogue entries for the abandonment plans that name this gale.
View sourceSources
- (secondary) Forest of Dean coal mining: Findall Mine Level — Lightmoor Press, Forest of Dean coal mining (Forest of Dean Local History Society records)
- (secondary) Northern Mine Research Society: Mines working in 1980 — Northern Mine Research Society
- (primary) BGS mine plans: FINDALL (Coleford High Delf, 4 April 1962) and FINDALL MINE LEVEL / EASTERN UNITED — British Geological Survey, mine plans catalogue (Mine Remediation Authority abandonment plans)
Record created: 25 November 2026 · Last researched: 25 November 2026