Alltami Colliery
| Location | Alltami, Northop parish, between Mold and Buckley, Flintshire |
|---|---|
| Commodity | Coal |
| Type | Coal |
| Worked | By 1875–after 1892 |
| Operators | Alltami Colliery Company Limited (1875–1884) — E. J. Bartlett secretary (1875) and managing director; receiver Thomas Parry by 1884. |
Alltami Colliery was a coal mine between Mold and Buckley in Flintshire, worked by the Alltami Colliery Company from 1875 until its receivership in 1884. It was still at work in 1892.
History
Alltami Colliery was a coal mine at Alltami, between Mold and Buckley in Flintshire, worked in the 1870s and 1880s by the Alltami Colliery Company, Limited. Its secretary, and later its managing director, was E. J. Bartlett. In February 1875 the company's meeting heard satisfactory news of the coal at its section B. By March, at section A, a drift was being driven in the Main coal at a depth of twenty-two yards, and the manager reported the seam holding its thickness of ten feet with no sign of dirt or interruption. In April the company advertised for a pair of second-hand horizontal engines, a Cornish boiler and a five-ton weighing machine, and in 1876 its manager, John Pryor, wanted a small donkey engine for winding up an incline.
By 1884 the company was in the hands of a receiver, Thomas Parry. In October that year the St Helen's Coal and Clay Company was registered to acquire land and other property in the parishes of Mold and Northop lately vested in the Alltami Colliery Company, and to carry on business as colliery proprietors, coke makers and brick and tile manufacturers. In February 1885 the receiver sued the Standard Barytes Company in Mold county court for £11 9s 9d for coal. Bartlett was managing director of the colliery and also managing director or secretary of the Standard Barytes Company and the Pennant Lead Mining Company, which worked at the same place and were, with slight variations, one and the same company. Who owed whom for the coal was, unsurprisingly, the whole difficulty. Coal sent from Alltami had always been charged to the two in equal halves; the barytes company said it had stopped work in January 1884 and had neither ordered nor burned the coal it was charged for in February.
The colliery was still at work in November 1892, when lads coming home from it were served beer at a beerhouse nearby and its keeper was summoned for it. The British Geological Survey holds an Alltami plan of the Main coal abandoned in 1877, plans of the Alltami Firm Old pit and of Alltami with Garner's, Leonard's and Lily Square pits in the Hollin and Main abandoned in 1885, and a Mold Argoed plan of 1886 that includes Alltami Nos. 1 and 2.
Geology
Coal Measures of the Flintshire coalfield. The Main coal was ten feet thick at twenty-two yards in 1875; plans also cover the Hollin.
Workings
Sections A and B were opened in 1875, with a drift in the Main coal at twenty-two yards and an incline worked by a donkey engine. Several pits (Firm Old, Garner's, Leonard's, Lily Square and Alltami Nos. 1 and 2) appear on plans abandoned between 1877 and 1886.
Closure
The company was in receivership by 1884 and its plans of the Hollin and Main were abandoned in 1885 and 1886, but the colliery was still at work in 1892. When it finally closed is unknown.
Further reading
The British Geological Survey catalogue entry for the Alltami, Garner's, Leonard's and Lily Square plan of 1885.
View sourceSources
- (secondary) The coal trade: Alltami Colliery, section A (Wrexham Advertiser, 13 March 1875) — Welsh Newspapers Online, National Library of Wales
- (secondary) The coal trade: the Alltami Colliery company meeting (Wrexham Advertiser, 20 February 1875) — Welsh Newspapers Online, National Library of Wales
- (secondary) Wanted: engines and boiler, Alltami Colliery Company, Limited (Wrexham Advertiser, 24 April 1875) — Welsh Newspapers Online, National Library of Wales
- (secondary) Wanted: donkey engine, apply to Mr J. Pryor, Alltami Colliery (Wrexham Advertiser, 12 August 1876) — Welsh Newspapers Online, National Library of Wales
- (secondary) Mold: a new company, the St Helen's Coal and Clay Company (Flintshire Observer, 23 October 1884) — Welsh Newspapers Online, National Library of Wales
- (secondary) Mold county court: Alltami Colliery Company v. the Standard Barytes Company (Wrexham Advertiser, 28 February 1885) — Welsh Newspapers Online, National Library of Wales
- (secondary) Mold petty sessions: beerhouse offence (Wrexham Advertiser, 12 November 1892) — Welsh Newspapers Online, National Library of Wales
- (primary) Mine plans 707, 1779, 1779A and 1918: Alltami (Main, 1877), Alltami Firm Old and Alltami with Garner's, Leonard's and Lily Square (1885), Mold Argoed with Alltami Nos. 1/2 (1886) — British Geological Survey, mine plans catalogue (Mine Remediation Authority abandonment plans)
Record created: 24 November 2026 · Last researched: 24 November 2026